Question

Electrical Safety (England) | England | Responsibilities and Liabilities (England)

Do I have to provide every existing tenant a copy of the electrical condition report by 31st December

7 Dec 2020 | 1 comment

I haven’t routinely shared inspection reports with tenants before. I have heard that some agents are sending a copy of the electrical report to all tenants, is this a deadline I should be aware of?

Answer

1 Comment

  1. guildy

    All new tenancies (including renewals and go into statutory periodic) require an electrical inspection, test and report under the 18th edition. A copy of the report must be sent to the tenant within 28 days.

    All existing tenancies must have the same by 1 April 2021.

    Please see here for full details.