I haven’t routinely shared inspection reports with tenants before. I have heard that some agents are sending a copy of the electrical report to all tenants, is this a deadline I should be aware of?
Question
Electrical Safety (England) | England | Responsibilities and Liabilities (England)
Do I have to provide every existing tenant a copy of the electrical condition report by 31st December
Answer
View your previously asked questions. (Will only show questions from August 2020)
(Link above back to topic only works for questions added after end of August 2020)
1 Comment
All new tenancies (including renewals and go into statutory periodic) require an electrical inspection, test and report under the 18th edition. A copy of the report must be sent to the tenant within 28 days.
All existing tenancies must have the same by 1 April 2021.
Please see here for full details.